NB Ramp to 24 Rd. over Leach Creek
FairMesa County, Colorado · NE of Redlands Pkwy Intr · Structure no. GRJ-24.07-E.9
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected February 2024
- Type
- Arch - Deck
- Steel
- Length
- 34 ft
- 2 main spans
- Daily traffic
- 2,181
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
NB Ramp to 24 Rd. over Leach Creek is a steel arch - deck carrying NB Ramp to 24 Rd. over Leach Creek in Mesa County, Colorado. It was built in 1983, so it is 42 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,181 vehicles a day, roughly 5% of them trucks, projected to reach 2,552 by 2042. The structure is 34 ft (10.3 m) long and 93 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB Ramp to 24 Rd. over Leach Creek built?
It was built in 1983, making it 42 years old in 2025.
What condition is NB Ramp to 24 Rd. over Leach Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does NB Ramp to 24 Rd. over Leach Creek carry?
About 2,181 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is NB Ramp to 24 Rd. over Leach Creek?
The structure is 34 ft (10.3 m) long with a longest span of 15 ft (4.7 m) and a deck 93 ft wide.
Who owns NB Ramp to 24 Rd. over Leach Creek?
It is owned by the City or Municipal Highway Agency.