I 25 Ml Sbnd over Timber Canyon
FairLas Animas County, Colorado · 10.9 MI S. of Aguilar Int · Structure no. O-18-CN
- Built
- 1997
- 28 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 192 ft
- 2 main spans
- Daily traffic
- 6,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Ml Sbnd over Timber Canyon is a prestressed concrete continuous stringer/multi-beam or girder carrying I 25 Ml Sbnd over Timber Canyon in Las Animas County, Colorado. It was built in 1997, so it is 28 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,000 vehicles a day, roughly 20% of them trucks, projected to reach 7,140 by 2040. The structure is 192 ft (58.4 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Ml Sbnd over Timber Canyon built?
It was built in 1997, making it 28 years old in 2025.
What condition is I 25 Ml Sbnd over Timber Canyon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does I 25 Ml Sbnd over Timber Canyon carry?
About 6,000 vehicles per day (2020 count), of which roughly 20% are trucks.
How long is I 25 Ml Sbnd over Timber Canyon?
The structure is 192 ft (58.4 m) long with a longest span of 94 ft (28.8 m) and a deck 40 ft wide.
Who owns I 25 Ml Sbnd over Timber Canyon?
It is owned by the State Highway Agency.