I 25 Ml Nbnd over Timber Canyon
FairLas Animas County, Colorado · 8.3 MI No of JCT SH 239 · Structure no. O-18-CH
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected October 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 90 ft
- 1 main span
- Daily traffic
- 6,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Ml Nbnd over Timber Canyon is a prestressed concrete tee beam carrying I 25 Ml Nbnd over Timber Canyon in Las Animas County, Colorado. It was built in 1969, so it is 56 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,000 vehicles a day, roughly 20% of them trucks, projected to reach 7,140 by 2040. The structure is 90 ft (27.4 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Ml Nbnd over Timber Canyon built?
It was built in 1969, making it 56 years old in 2025.
What condition is I 25 Ml Nbnd over Timber Canyon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does I 25 Ml Nbnd over Timber Canyon carry?
About 6,000 vehicles per day (2020 count), of which roughly 20% are trucks.
How long is I 25 Ml Nbnd over Timber Canyon?
The structure is 90 ft (27.4 m) long with a longest span of 86 ft (26.2 m) and a deck 41 ft wide.
Who owns I 25 Ml Nbnd over Timber Canyon?
It is owned by the State Highway Agency.