Lemay Avenue over Larimer and Weld Canal

Fair

Larimer County, Colorado · 1.2 MI N of Vine Drive · Structure no. FCLMY-1.2-VINE

Built
1958
67 years old, rebuilt 1990
Condition
Fair
inspected April 2023
Type
Tee Beam
Prestressed Concrete
Length
59 ft
1 main span
Daily traffic
8,064
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lemay Avenue over Larimer and Weld Canal is a prestressed concrete tee beam carrying Lemay Avenue over Larimer and Weld Canal in Larimer County, Colorado. It was built in 1958 and reconstructed in 1990, so it is 67 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,064 vehicles a day, roughly 4% of them trucks, projected to reach 10,080 by 2042. The structure is 59 ft (18.1 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLemay Avenue
CrossesLarimer and Weld Canal
Location1.2 MI N of Vine Drive
RouteCity Street 0
Coordinates40.6135, -105.0575
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length59 ft (18.1 m)
Longest span56 ft (17.1 m)
Deck width30 ft (9.2 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,064 (2022)
Projected traffic10,080 by 2042
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$315,000 (2019 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Lemay Avenue over Larimer and Weld Canal built?

It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1990.

What condition is Lemay Avenue over Larimer and Weld Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Lemay Avenue over Larimer and Weld Canal carry?

About 8,064 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Lemay Avenue over Larimer and Weld Canal?

The structure is 59 ft (18.1 m) long with a longest span of 56 ft (17.1 m) and a deck 30 ft wide.

Who owns Lemay Avenue over Larimer and Weld Canal?

It is owned by the City or Municipal Highway Agency.