US Bridges

N Lemay Ave & BNSF over E Vine Drive

Good

Larimer County, Colorado · 2.77 MI West of JCT-I25 · Structure no. FCLMY-0.0-VINE

Built
2023
2 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
139 ft
1 main span
Daily traffic
12,491
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

N Lemay Ave & BNSF over E Vine Drive is a prestressed concrete box beam or girders - multiple carrying N Lemay Ave & BNSF over E Vine Drive in Larimer County, Colorado. It was built in 2023, so it is 2 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,491 vehicles a day, projected to reach 22,491 by 2042. The structure is 139 ft (42.3 m) long and 82 ft wide.

CarriesN Lemay Ave & BNSF
CrossesE Vine Drive
Location2.77 MI West of JCT-I25
RouteCity Street 0
Coordinates40.59584, -105.05424
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length139 ft (42.3 m)
Longest span134 ft (40.8 m)
Deck width82 ft (25 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,491 (2022)
Projected traffic22,491 by 2042
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and railroad
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N Lemay Ave & BNSF over E Vine Drive built?

It was built in 2023, making it 2 years old in 2025.

What condition is N Lemay Ave & BNSF over E Vine Drive in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does N Lemay Ave & BNSF over E Vine Drive carry?

About 12,491 vehicles per day (2022 count).

How long is N Lemay Ave & BNSF over E Vine Drive?

The structure is 139 ft (42.3 m) long with a longest span of 134 ft (40.8 m) and a deck 82 ft wide.

Who owns N Lemay Ave & BNSF over E Vine Drive?

It is owned by the City or Municipal Highway Agency.