US Bridges

W 92nd Lane over Farmers Highline Canal

Good

Jefferson County, Colorado · Just N of 92 Avenue · Structure no. WST03-10-M

Built
1995
30 years old
Condition
Good
inspected March 2023
Type
Frame
Concrete
Length
26 ft
1 main span
Daily traffic
609
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

W 92nd Lane over Farmers Highline Canal is a concrete frame carrying W 92nd Lane over Farmers Highline Canal in Jefferson County, Colorado. It was built in 1995, so it is 30 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 609 vehicles a day, projected to reach 700 by 2041. The structure is 26 ft (7.9 m) long and 55 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesW 92nd Lane
CrossesFarmers Highline Canal
LocationJust N of 92 Avenue
RouteCity Street 0
Coordinates39.864, -105.07261
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating41.3 US tons
Inventory rating24.8 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span24 ft (7.3 m)
Deck width55 ft (16.8 m)
Roadway width35 ft (10.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic609 (2021)
Projected traffic700 by 2041
Trucks0%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$151,000
NavigationNo navigation control on waterway

Frequently asked questions

When was W 92nd Lane over Farmers Highline Canal built?

It was built in 1995, making it 30 years old in 2025.

What condition is W 92nd Lane over Farmers Highline Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does W 92nd Lane over Farmers Highline Canal carry?

About 609 vehicles per day (2021 count).

How long is W 92nd Lane over Farmers Highline Canal?

The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.3 m) and a deck 55 ft wide.

Who owns W 92nd Lane over Farmers Highline Canal?

It is owned by the City or Municipal Highway Agency.