US Bridges

SH 121 Ml over Highline Canal

Fair

Jefferson County, Colorado · South of 92nd Ave. · Structure no. E-16-HN

Built
1968
57 years old
Condition
Fair
inspected January 2025
Type
Culvert
Concrete
Length
22 ft
1 main span
Daily traffic
43,000
2020 count
Owner
State
State Highway Agency

About this bridge

SH 121 Ml over Highline Canal is a concrete culvert carrying SH 121 Ml over Highline Canal in Jefferson County, Colorado. It was built in 1968, so it is 57 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 43,000 vehicles a day, roughly 1% of them trucks, projected to reach 50,310 by 2040. The structure is 22 ft (6.6 m) long and 145 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSH 121 Ml
CrossesHighline Canal
LocationSouth of 92nd Ave.
RouteState Highway 121A
Coordinates39.86195, -105.08253
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating89.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length22 ft (6.6 m)
Longest span22 ft (6.6 m)
Deck width145 ft (44.3 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic43,000 (2020)
Projected traffic50,310 by 2040
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 121 Ml over Highline Canal built?

It was built in 1968, making it 57 years old in 2025.

What condition is SH 121 Ml over Highline Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does SH 121 Ml over Highline Canal carry?

About 43,000 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is SH 121 Ml over Highline Canal?

The structure is 22 ft (6.6 m) long with a longest span of 22 ft (6.6 m) and a deck 145 ft wide.

Who owns SH 121 Ml over Highline Canal?

It is owned by the State Highway Agency.