US Bridges

Ebnd Academy Blvd over Ramp to Wbnd Academy

Good

El Paso County, Colorado · 0.8 MI W of I-25 · Structure no. EPC4099-01.13R

Built
2010
15 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
125 ft
1 main span
Daily traffic
20,497
2021 count
Owner
County
County Highway Agency

About this bridge

Ebnd Academy Blvd over Ramp to Wbnd Academy is a prestressed concrete stringer/multi-beam or girder carrying Ebnd Academy Blvd over Ramp to Wbnd Academy in El Paso County, Colorado. It was built in 2010, so it is 15 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,497 vehicles a day, roughly 5% of them trucks, projected to reach 26,851 by 2041. The structure is 125 ft (38.2 m) long and 65 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEbnd Academy Blvd
CrossesRamp to Wbnd Academy
Location0.8 MI W of I-25
RouteCounty Highway 0
Coordinates38.76566, -104.78917
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating26.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length125 ft (38.2 m)
Longest span120 ft (36.7 m)
Deck width65 ft (19.8 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,497 (2021)
Projected traffic26,851 by 2041
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ebnd Academy Blvd over Ramp to Wbnd Academy built?

It was built in 2010, making it 15 years old in 2025.

What condition is Ebnd Academy Blvd over Ramp to Wbnd Academy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Ebnd Academy Blvd over Ramp to Wbnd Academy carry?

About 20,497 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Ebnd Academy Blvd over Ramp to Wbnd Academy?

The structure is 125 ft (38.2 m) long with a longest span of 120 ft (36.7 m) and a deck 65 ft wide.

Who owns Ebnd Academy Blvd over Ramp to Wbnd Academy?

It is owned by the County Highway Agency.