US Bridges

Wbnd Academy Blvd over Ramp D to Wbnd Academy

Good

El Paso County, Colorado · 0.8 MI W of I-25 · Structure no. EPC4099-01.13L

Built
2012
13 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
125 ft
1 main span
Daily traffic
22,809
2021 count
Owner
County
County Highway Agency

About this bridge

Wbnd Academy Blvd over Ramp D to Wbnd Academy is a prestressed concrete stringer/multi-beam or girder carrying Wbnd Academy Blvd over Ramp D to Wbnd Academy in El Paso County, Colorado. It was built in 2012, so it is 13 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,809 vehicles a day, roughly 5% of them trucks, projected to reach 29,880 by 2041. The structure is 125 ft (38.2 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWbnd Academy Blvd
CrossesRamp D to Wbnd Academy
Location0.8 MI W of I-25
RouteCounty Highway 0
Coordinates38.76589, -104.78832
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.7 US tons
Inventory rating27.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length125 ft (38.2 m)
Longest span120 ft (36.7 m)
Deck width55 ft (16.8 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,809 (2021)
Projected traffic29,880 by 2041
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Wbnd Academy Blvd over Ramp D to Wbnd Academy built?

It was built in 2012, making it 13 years old in 2025.

What condition is Wbnd Academy Blvd over Ramp D to Wbnd Academy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Wbnd Academy Blvd over Ramp D to Wbnd Academy carry?

About 22,809 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Wbnd Academy Blvd over Ramp D to Wbnd Academy?

The structure is 125 ft (38.2 m) long with a longest span of 120 ft (36.7 m) and a deck 55 ft wide.

Who owns Wbnd Academy Blvd over Ramp D to Wbnd Academy?

It is owned by the County Highway Agency.