US Bridges

Academy Blvd over Templeton Gap Basin

Fair

El Paso County, Colorado · 0.6 MI N. of Austin Bluff · Structure no. CSG-J.75-13.04

Built
1966
59 years old
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
21 ft
2 main spans
Daily traffic
41,888
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Academy Blvd over Templeton Gap Basin is a concrete culvert carrying Academy Blvd over Templeton Gap Basin in El Paso County, Colorado. It was built in 1966, so it is 59 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 41,888 vehicles a day, roughly 3% of them trucks, projected to reach 54,873 by 2041. The structure is 21 ft (6.5 m) long and 117 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesAcademy Blvd
CrossesTempleton Gap Basin
Location0.6 MI N. of Austin Bluff
RouteCity Street 0
Coordinates38.8979, -104.76242
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length21 ft (6.5 m)
Longest span10 ft (3.1 m)
Deck width117 ft (35.7 m)
Roadway width94 ft (28.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic41,888 (2021)
Projected traffic54,873 by 2041
Trucks3%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Academy Blvd over Templeton Gap Basin built?

It was built in 1966, making it 59 years old in 2025.

What condition is Academy Blvd over Templeton Gap Basin in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Academy Blvd over Templeton Gap Basin carry?

About 41,888 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Academy Blvd over Templeton Gap Basin?

The structure is 21 ft (6.5 m) long with a longest span of 10 ft (3.1 m) and a deck 117 ft wide.

Who owns Academy Blvd over Templeton Gap Basin?

It is owned by the City or Municipal Highway Agency.