US Bridges

Austin Bluffs Pkwy over Templeton Gap Basin

Fair

El Paso County, Colorado · 0.8 MI W of Academy Blvd · Structure no. CSG-J.00-12.48

Built
1976
49 years old, rebuilt 2014
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
32 ft
2 main spans
Daily traffic
46,425
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Austin Bluffs Pkwy over Templeton Gap Basin is a concrete culvert carrying Austin Bluffs Pkwy over Templeton Gap Basin in El Paso County, Colorado. It was built in 1976 and reconstructed in 2014, so it is 49 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 46,425 vehicles a day, roughly 5% of them trucks, projected to reach 60,817 by 2041. The structure is 32 ft (9.7 m) long and 156 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAustin Bluffs Pkwy
CrossesTempleton Gap Basin
Location0.8 MI W of Academy Blvd
RouteCity Street 0
Coordinates38.88915, -104.77356
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length32 ft (9.7 m)
Longest span15 ft (4.7 m)
Deck width156 ft (47.4 m)
Roadway width94 ft (28.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic46,425 (2021)
Projected traffic60,817 by 2041
Trucks5%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Austin Bluffs Pkwy over Templeton Gap Basin built?

It was built in 1976, making it 49 years old in 2025. It was reconstructed in 2014.

What condition is Austin Bluffs Pkwy over Templeton Gap Basin in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Austin Bluffs Pkwy over Templeton Gap Basin carry?

About 46,425 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Austin Bluffs Pkwy over Templeton Gap Basin?

The structure is 32 ft (9.7 m) long with a longest span of 15 ft (4.7 m) and a deck 156 ft wide.

Who owns Austin Bluffs Pkwy over Templeton Gap Basin?

It is owned by the City or Municipal Highway Agency.