US Bridges

Ramp to Union over Templeton Gap Floodway

Good

El Paso County, Colorado · Austin Bluffs Pkwy/Union · Structure no. CSG-I.48-12.32

Built
2009
16 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
195 ft
2 main spans
Daily traffic
6,359
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Ramp to Union over Templeton Gap Floodway is a prestressed concrete continuous stringer/multi-beam or girder carrying Ramp to Union over Templeton Gap Floodway in El Paso County, Colorado. It was built in 2009, so it is 16 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,359 vehicles a day, roughly 5% of them trucks, projected to reach 8,331 by 2041. The structure is 195 ft (59.5 m) long and 42 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRamp to Union
CrossesTempleton Gap Floodway
LocationAustin Bluffs Pkwy/Union
RouteCity Street 0
Coordinates38.88933, -104.78497
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.4 US tons
Inventory rating52.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans2
Design loadUnknown
Structure length195 ft (59.5 m)
Longest span95 ft (29 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,359 (2021)
Projected traffic8,331 by 2041
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp to Union over Templeton Gap Floodway built?

It was built in 2009, making it 16 years old in 2025.

What condition is Ramp to Union over Templeton Gap Floodway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Ramp to Union over Templeton Gap Floodway carry?

About 6,359 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Ramp to Union over Templeton Gap Floodway?

The structure is 195 ft (59.5 m) long with a longest span of 95 ft (29 m) and a deck 42 ft wide.

Who owns Ramp to Union over Templeton Gap Floodway?

It is owned by the City or Municipal Highway Agency.