US Bridges

Ramp to SB Academy over Parking Lot Exit

Good

El Paso County, Colorado · Just S of Woodmen RD · Structure no. CSG-I.02-15.48

Built
2012
13 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
57 ft
1 main span
Daily traffic
4,629
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Ramp to SB Academy over Parking Lot Exit is a prestressed concrete stringer/multi-beam or girder carrying Ramp to SB Academy over Parking Lot Exit in El Paso County, Colorado. It was built in 2012, so it is 13 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,629 vehicles a day, roughly 2% of them trucks, projected to reach 6,064 by 2041. The structure is 57 ft (17.4 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRamp to SB Academy
CrossesParking Lot Exit
LocationJust S of Woodmen RD
RouteCity Street 0
Coordinates38.93221, -104.79638
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.9 US tons
Inventory rating67.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length57 ft (17.4 m)
Longest span55 ft (16.7 m)
Deck width44 ft (13.4 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,629 (2021)
Projected traffic6,064 by 2041
Trucks2%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp to SB Academy over Parking Lot Exit built?

It was built in 2012, making it 13 years old in 2025.

What condition is Ramp to SB Academy over Parking Lot Exit in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Ramp to SB Academy over Parking Lot Exit carry?

About 4,629 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is Ramp to SB Academy over Parking Lot Exit?

The structure is 57 ft (17.4 m) long with a longest span of 55 ft (16.7 m) and a deck 44 ft wide.

Who owns Ramp to SB Academy over Parking Lot Exit?

It is owned by the City or Municipal Highway Agency.