Jordan Road over Newlin Gulch | Newlin Gu
GoodDouglas County, Colorado · 0.1 MI S of Lincoln Ave. · Structure no. PAR JORDAN-0.1
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected February 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 106 ft
- 2 main spans
- Daily traffic
- 23,638
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Jordan Road over Newlin Gulch | Newlin Gu is a prestressed concrete continuous box beam or girders - multiple carrying Jordan Road over Newlin Gulch | Newlin Gu in Douglas County, Colorado. It was built in 1995, so it is 30 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 23,638 vehicles a day, roughly 6% of them trucks, projected to reach 31,675 by 2041. The structure is 106 ft (32.3 m) long and 73 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jordan Road over Newlin Gulch | Newlin Gu built?
It was built in 1995, making it 30 years old in 2025.
What condition is Jordan Road over Newlin Gulch | Newlin Gu in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does Jordan Road over Newlin Gulch | Newlin Gu carry?
About 23,638 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is Jordan Road over Newlin Gulch | Newlin Gu?
The structure is 106 ft (32.3 m) long with a longest span of 49 ft (14.8 m) and a deck 73 ft wide.
Who owns Jordan Road over Newlin Gulch | Newlin Gu?
It is owned by the Town or Township Highway Agency.