Stonegate Parkway over Newlin Gulch
FairDouglas County, Colorado · 0.5 MI S of Lincoln Blvd · Structure no. DOU008-03.50
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 94 ft
- 1 main span
- Daily traffic
- 3,008
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Stonegate Parkway over Newlin Gulch is a prestressed concrete stringer/multi-beam or girder carrying Stonegate Parkway over Newlin Gulch in Douglas County, Colorado. It was built in 1995, so it is 30 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,008 vehicles a day, roughly 4% of them trucks, projected to reach 4,031 by 2041. The structure is 94 ft (28.8 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stonegate Parkway over Newlin Gulch built?
It was built in 1995, making it 30 years old in 2025.
What condition is Stonegate Parkway over Newlin Gulch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does Stonegate Parkway over Newlin Gulch carry?
About 3,008 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is Stonegate Parkway over Newlin Gulch?
The structure is 94 ft (28.8 m) long with a longest span of 91 ft (27.6 m) and a deck 46 ft wide.
Who owns Stonegate Parkway over Newlin Gulch?
It is owned by the County Highway Agency.