I270 EB RMPTOI70EB over I70 EB Rmp to Cent Prk
GoodDenver County, Colorado · I-270 to I-70E on Ramp · Structure no. E-17-AEC
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 415 ft
- 3 main spans
- Daily traffic
- 90,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I270 EB RMPTOI70EB over I70 EB Rmp to Cent Prk is a prestressed concrete continuous stringer/multi-beam or girder carrying I270 EB RMPTOI70EB over I70 EB Rmp to Cent Prk in Denver County, Colorado. It was built in 2012, so it is 13 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 90,500 vehicles a day, roughly 8% of them trucks, projected to reach 108,600 by 2040. The structure is 415 ft (126.4 m) long and 39 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I270 EB RMPTOI70EB over I70 EB Rmp to Cent Prk built?
It was built in 2012, making it 13 years old in 2025.
What condition is I270 EB RMPTOI70EB over I70 EB Rmp to Cent Prk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does I270 EB RMPTOI70EB over I70 EB Rmp to Cent Prk carry?
About 90,500 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is I270 EB RMPTOI70EB over I70 EB Rmp to Cent Prk?
The structure is 415 ft (126.4 m) long with a longest span of 158 ft (48.3 m) and a deck 39 ft wide.
Who owns I270 EB RMPTOI70EB over I70 EB Rmp to Cent Prk?
It is owned by the State Highway Agency.