Central Park Blvd over Smith RD | UPRR | Sand C
GoodDenver County, Colorado · 0.5 MI S of I70 · Structure no. D-03-V-300
- Built
- 2012
- 13 years old, rebuilt 2017
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 803 ft
- 7 main spans
- Daily traffic
- 27,939
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Central Park Blvd over Smith RD | UPRR | Sand C is a prestressed concrete continuous stringer/multi-beam or girder carrying Central Park Blvd over Smith RD | UPRR | Sand C in Denver County, Colorado. It was built in 2012 and reconstructed in 2017, so it is 13 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 27,939 vehicles a day, roughly 1% of them trucks, projected to reach 31,012 by 2041. The structure is 803 ft (244.8 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Central Park Blvd over Smith RD | UPRR | Sand C built?
It was built in 2012, making it 13 years old in 2025. It was reconstructed in 2017.
What condition is Central Park Blvd over Smith RD | UPRR | Sand C in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Central Park Blvd over Smith RD | UPRR | Sand C carry?
About 27,939 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is Central Park Blvd over Smith RD | UPRR | Sand C?
The structure is 803 ft (244.8 m) long with a longest span of 159 ft (48.4 m) and a deck 81 ft wide.
Who owns Central Park Blvd over Smith RD | UPRR | Sand C?
It is owned by the City or Municipal Highway Agency.