US Bridges

SE 4/5th Level Par over 84th Avenue

Fair

Denver County, Colorado · Btwn SE Garages · Structure no. D-31-PB-802

Built
2017
8 years old
Condition
Fair
inspected January 2025
Type
Tee Beam
Prestressed Concrete
Length
125 ft
3 main spans
Daily traffic
348
2021 count
Owner
Local
Other Local Agency

About this bridge

SE 4/5th Level Par over 84th Avenue is a prestressed concrete tee beam carrying SE 4/5th Level Par over 84th Avenue in Denver County, Colorado. It was built in 2017, so it is 8 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 348 vehicles a day, projected to reach 386 by 2041. The structure is 125 ft (38.2 m) long and 46 ft wide.

CarriesSE 4/5th Level Par
Crosses84th Avenue
LocationBtwn SE Garages
RouteCity Street 0
Coordinates39.84804, -104.67201
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length125 ft (38.2 m)
Longest span58 ft (17.6 m)
Deck width46 ft (14 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic348 (2021)
Projected traffic386 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SE 4/5th Level Par over 84th Avenue built?

It was built in 2017, making it 8 years old in 2025.

What condition is SE 4/5th Level Par over 84th Avenue in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does SE 4/5th Level Par over 84th Avenue carry?

About 348 vehicles per day (2021 count).

How long is SE 4/5th Level Par over 84th Avenue?

The structure is 125 ft (38.2 m) long with a longest span of 58 ft (17.6 m) and a deck 46 ft wide.

Who owns SE 4/5th Level Par over 84th Avenue?

It is owned by the Other Local Agency.