SE 2nd Level Parki over Parking Garage
FairDenver County, Colorado · East Parking Structure · Structure no. D-31-PB-733
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected January 2025
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 93 ft
- 1 main span
- Daily traffic
- 1,749
- 2021 count
- Owner
- Local
- Other Local Agency
About this bridge
SE 2nd Level Parki over Parking Garage is a prestressed concrete box beam or girders - single or spread carrying SE 2nd Level Parki over Parking Garage in Denver County, Colorado. It was built in 1993, so it is 32 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,749 vehicles a day, projected to reach 1,942 by 2041. The structure is 93 ft (28.3 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SE 2nd Level Parki over Parking Garage built?
It was built in 1993, making it 32 years old in 2025.
What condition is SE 2nd Level Parki over Parking Garage in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does SE 2nd Level Parki over Parking Garage carry?
About 1,749 vehicles per day (2021 count).
How long is SE 2nd Level Parki over Parking Garage?
The structure is 93 ft (28.3 m) long with a longest span of 47 ft (14.3 m) and a deck 38 ft wide.
Who owns SE 2nd Level Parki over Parking Garage?
It is owned by the Other Local Agency.