County Road 28 over Conejos River
FairPosted for loadConejos County, Colorado · 1.5 MI N of Crx · Structure no. CON15.0E-15.2N
- Built
- 1947
- 78 years old
- Condition
- Fair
- inspected March 2025
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 162 ft
- 7 main spans
- Daily traffic
- 68
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 28 over Conejos River is a wood or timber stringer/multi-beam or girder carrying County Road 28 over Conejos River in Conejos County, Colorado. It was built in 1947, so it is 78 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 68 vehicles a day, projected to reach 78 by 2042. The structure is 162 ft (49.5 m) long and 26 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 28 over Conejos River built?
It was built in 1947, making it 78 years old in 2025.
What condition is County Road 28 over Conejos River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2025.
How much traffic does County Road 28 over Conejos River carry?
About 68 vehicles per day (2022 count).
How long is County Road 28 over Conejos River?
The structure is 162 ft (49.5 m) long with a longest span of 23 ft (6.9 m) and a deck 26 ft wide.
Who owns County Road 28 over Conejos River?
It is owned by the County Highway Agency.