County Road 28 over Conejos River Diversion
GoodPosted for loadConejos County, Colorado · .6 MI N of CR X · Structure no. CON15.0E-14.6NA
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected March 2025
- Type
- Girder and Floorbeam System
- Steel
- Length
- 89 ft
- 1 main span
- Daily traffic
- 60
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 28 over Conejos River Diversion is a steel girder and floorbeam system carrying County Road 28 over Conejos River Diversion in Conejos County, Colorado. It was built in 2024, so it is 1 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 60 vehicles a day, projected to reach 69 by 2042. The structure is 89 ft (27.2 m) long and 27 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 28 over Conejos River Diversion built?
It was built in 2024, making it 1 years old in 2025.
What condition is County Road 28 over Conejos River Diversion in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2025.
How much traffic does County Road 28 over Conejos River Diversion carry?
About 60 vehicles per day (2022 count).
How long is County Road 28 over Conejos River Diversion?
The structure is 89 ft (27.2 m) long with a longest span of 80 ft (24.4 m) and a deck 27 ft wide.
Who owns County Road 28 over Conejos River Diversion?
It is owned by the County Highway Agency.