US Bridges

County Road 28 over Conejos River Diversion

GoodPosted for load

Conejos County, Colorado · .6 MI N of CR X · Structure no. CON15.0E-14.6NA

Built
2024
1 years old
Condition
Good
inspected March 2025
Type
Girder and Floorbeam System
Steel
Length
89 ft
1 main span
Daily traffic
60
2022 count
Owner
County
County Highway Agency

About this bridge

County Road 28 over Conejos River Diversion is a steel girder and floorbeam system carrying County Road 28 over Conejos River Diversion in Conejos County, Colorado. It was built in 2024, so it is 1 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 60 vehicles a day, projected to reach 69 by 2042. The structure is 89 ft (27.2 m) long and 27 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesCounty Road 28
CrossesConejos River Diversion
Location.6 MI N of CR X
RouteCounty Highway 0
Coordinates37.29293, -105.74737
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2025
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckSteel plate
Main spans1
Design loadUnknown
Structure length89 ft (27.2 m)
Longest span80 ft (24.4 m)
Deck width27 ft (8.3 m)
Roadway width27 ft (8.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2022)
Projected traffic69 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 28 over Conejos River Diversion built?

It was built in 2024, making it 1 years old in 2025.

What condition is County Road 28 over Conejos River Diversion in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2025.

How much traffic does County Road 28 over Conejos River Diversion carry?

About 60 vehicles per day (2022 count).

How long is County Road 28 over Conejos River Diversion?

The structure is 89 ft (27.2 m) long with a longest span of 80 ft (24.4 m) and a deck 27 ft wide.

Who owns County Road 28 over Conejos River Diversion?

It is owned by the County Highway Agency.