I 70 Ml Ebnd over CO RD Clear Creek
FairClear Creek County, Colorado · 4.7 MI E of JCT SH 103 · Structure no. F-15-CM
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 243 ft
- 3 main spans
- Daily traffic
- 23,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 70 Ml Ebnd over CO RD Clear Creek is a steel stringer/multi-beam or girder carrying I 70 Ml Ebnd over CO RD Clear Creek in Clear Creek County, Colorado. It was built in 1974, so it is 51 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,500 vehicles a day, roughly 7% of them trucks, projected to reach 29,140 by 2040. The structure is 243 ft (74.1 m) long and 56 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 70 Ml Ebnd over CO RD Clear Creek built?
It was built in 1974, making it 51 years old in 2025.
What condition is I 70 Ml Ebnd over CO RD Clear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does I 70 Ml Ebnd over CO RD Clear Creek carry?
About 23,500 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is I 70 Ml Ebnd over CO RD Clear Creek?
The structure is 243 ft (74.1 m) long with a longest span of 80 ft (24.5 m) and a deck 56 ft wide.
Who owns I 70 Ml Ebnd over CO RD Clear Creek?
It is owned by the State Highway Agency.