Ramp to I 70 Ebnd over Clear Creek R
GoodClear Creek County, Colorado · 3.4 MI E. of JCT SH 103 · Structure no. F-15-BZ
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 225 ft
- 3 main spans
- Daily traffic
- 23,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp to I 70 Ebnd over Clear Creek R is a prestressed concrete continuous stringer/multi-beam or girder carrying Ramp to I 70 Ebnd over Clear Creek R in Clear Creek County, Colorado. It was built in 1999, so it is 26 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 23,500 vehicles a day, roughly 7% of them trucks, projected to reach 29,140 by 2040. The structure is 225 ft (68.6 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp to I 70 Ebnd over Clear Creek R built?
It was built in 1999, making it 26 years old in 2025.
What condition is Ramp to I 70 Ebnd over Clear Creek R in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Ramp to I 70 Ebnd over Clear Creek R carry?
About 23,500 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Ramp to I 70 Ebnd over Clear Creek R?
The structure is 225 ft (68.6 m) long with a longest span of 97 ft (29.6 m) and a deck 31 ft wide.
Who owns Ramp to I 70 Ebnd over Clear Creek R?
It is owned by the State Highway Agency.