US Bridges

SH 470 Ml Wbnd over South Platte River

Good

Arapahoe County, Colorado · 0.4 MI W.Of US 85 · Structure no. F-16-IF

Built
2019
6 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
215 ft
2 main spans
Daily traffic
36,500
2020 count
Owner
State
State Highway Agency

About this bridge

SH 470 Ml Wbnd over South Platte River is a prestressed concrete continuous stringer/multi-beam or girder carrying SH 470 Ml Wbnd over South Platte River in Arapahoe County, Colorado. It was built in 2019, so it is 6 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 36,500 vehicles a day, roughly 3% of them trucks, projected to reach 47,815 by 2040. The structure is 215 ft (65.5 m) long and 77 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSH 470 Ml Wbnd
CrossesSouth Platte River
Location0.4 MI W.Of US 85
RouteState Highway 470A
Coordinates39.566, -105.041
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans2
Design loadHL 93
Structure length215 ft (65.5 m)
Longest span101 ft (30.8 m)
Deck width77 ft (23.5 m)
Roadway width74 ft (22.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic36,500 (2020)
Projected traffic47,815 by 2040
Trucks3%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 470 Ml Wbnd over South Platte River built?

It was built in 2019, making it 6 years old in 2025.

What condition is SH 470 Ml Wbnd over South Platte River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SH 470 Ml Wbnd over South Platte River carry?

About 36,500 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is SH 470 Ml Wbnd over South Platte River?

The structure is 215 ft (65.5 m) long with a longest span of 101 ft (30.8 m) and a deck 77 ft wide.

Who owns SH 470 Ml Wbnd over South Platte River?

It is owned by the State Highway Agency.