SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF
GoodArapahoe County, Colorado · JCT US 85 and SH 470 · Structure no. F-16-YE
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected August 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 1,729 ft
- 12 main spans
- Daily traffic
- 37,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF is a prestressed concrete continuous box beam or girders - single or spread carrying SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF in Arapahoe County, Colorado. It was built in 2011, so it is 14 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 37,000 vehicles a day, roughly 9% of them trucks, projected to reach 46,250 by 2040. The structure is 1,729 ft (526.9 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF built?
It was built in 2011, making it 14 years old in 2025.
What condition is SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF carry?
About 37,000 vehicles per day (2020 count), of which roughly 9% are trucks.
How long is SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF?
The structure is 1,729 ft (526.9 m) long with a longest span of 163 ft (49.8 m) and a deck 33 ft wide.
Who owns SBUS85TOEBC470RMP over US85/C470ML/UPRR/BNSF?
It is owned by the State Highway Agency.