I 25 Ml Sbnd & Hov over Clear Creek
FairAdams County, Colorado · 0.2 MI N. of 76 Ml · Structure no. E-17-PA
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected July 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 275 ft
- 3 main spans
- Daily traffic
- 121,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Ml Sbnd & Hov over Clear Creek is a prestressed concrete continuous box beam or girders - single or spread carrying I 25 Ml Sbnd & Hov over Clear Creek in Adams County, Colorado. It was built in 1993, so it is 32 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 121,000 vehicles a day, roughly 10% of them trucks, projected to reach 141,570 by 2040. The structure is 275 ft (83.8 m) long and 161 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Ml Sbnd & Hov over Clear Creek built?
It was built in 1993, making it 32 years old in 2025.
What condition is I 25 Ml Sbnd & Hov over Clear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does I 25 Ml Sbnd & Hov over Clear Creek carry?
About 121,000 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is I 25 Ml Sbnd & Hov over Clear Creek?
The structure is 275 ft (83.8 m) long with a longest span of 92 ft (27.9 m) and a deck 161 ft wide.
Who owns I 25 Ml Sbnd & Hov over Clear Creek?
It is owned by the State Highway Agency.