Olive School Lane over Pleasant Creek
FairSolano County, California · 1.1 MI S Putah Creek RD · Structure no. 23C0203
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete Continuous
- Length
- 57 ft
- 2 main spans
- Daily traffic
- 250
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Olive School Lane over Pleasant Creek is a concrete continuous slab carrying Olive School Lane over Pleasant Creek in Solano County, California. It was built in 1990, so it is 35 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 250 vehicles a day, roughly 2% of them trucks, projected to reach 357 by 2041. The structure is 57 ft (17.5 m) long and 31 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Olive School Lane over Pleasant Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is Olive School Lane over Pleasant Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Olive School Lane over Pleasant Creek carry?
About 250 vehicles per day (2010 count), of which roughly 2% are trucks.
How long is Olive School Lane over Pleasant Creek?
The structure is 57 ft (17.5 m) long with a longest span of 29 ft (8.8 m) and a deck 31 ft wide.
Who owns Olive School Lane over Pleasant Creek?
It is owned by the County Highway Agency.