Olive School Lane over Putah South Canal
GoodSolano County, California · 0.10 MI SW Putah Creek RD · Structure no. 23C0197
- Built
- 1955
- 70 years old, rebuilt 1999
- Condition
- Good
- inspected March 2023
- Type
- Girder and Floorbeam System
- Concrete Continuous
- Length
- 115 ft
- 3 main spans
- Daily traffic
- 404
- 2009 count
- Owner
- County
- County Highway Agency
About this bridge
Olive School Lane over Putah South Canal is a concrete continuous girder and floorbeam system carrying Olive School Lane over Putah South Canal in Solano County, California. It was built in 1955 and reconstructed in 1999, so it is 70 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 404 vehicles a day, roughly 2% of them trucks, projected to reach 600 by 2041. The structure is 115 ft (35.1 m) long and 28 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Olive School Lane over Putah South Canal built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1999.
What condition is Olive School Lane over Putah South Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Olive School Lane over Putah South Canal carry?
About 404 vehicles per day (2009 count), of which roughly 2% are trucks.
How long is Olive School Lane over Putah South Canal?
The structure is 115 ft (35.1 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.
Who owns Olive School Lane over Putah South Canal?
It is owned by the County Highway Agency.