US Bridges

State Route 37 over White Slough

Good

Solano County, California · 04-SOL-037-8.91-VAL · Structure no. 23 0238

Built
2004
21 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete Continuous
Length
52 ft
4 main spans
Daily traffic
29,000
2009 count
Owner
State
State Highway Agency

About this bridge

State Route 37 over White Slough is a concrete continuous culvert carrying State Route 37 over White Slough in Solano County, California. It was built in 2004, so it is 21 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29,000 vehicles a day, roughly 25% of them trucks, projected to reach 61,609 by 2040. The structure is 52 ft (15.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesState Route 37
CrossesWhite Slough
Location04-SOL-037-8.91-VAL
RouteState Highway 37
Coordinates38.13083, -122.2634
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans4
Design loadUnknown
Structure length52 ft (15.8 m)
Longest span13 ft (4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,000 (2009)
Projected traffic61,609 by 2040
Trucks25%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was State Route 37 over White Slough built?

It was built in 2004, making it 21 years old in 2025.

What condition is State Route 37 over White Slough in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does State Route 37 over White Slough carry?

About 29,000 vehicles per day (2009 count), of which roughly 25% are trucks.

How long is State Route 37 over White Slough?

The structure is 52 ft (15.8 m) long with a longest span of 13 ft (4 m).

Who owns State Route 37 over White Slough?

It is owned by the State Highway Agency.