State Route 37 over ST RTE 29 Chabot Creek
FairSolano County, California · 04-SOL-037-R9.52-VAL · Structure no. 23 0218
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected December 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 969 ft
- 6 main spans
- Daily traffic
- 29,000
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
State Route 37 over ST RTE 29 Chabot Creek is a prestressed concrete continuous box beam or girders - multiple carrying State Route 37 over ST RTE 29 Chabot Creek in Solano County, California. It was built in 2005, so it is 20 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 29,000 vehicles a day, roughly 25% of them trucks, projected to reach 61,609 by 2040. The structure is 969 ft (295.5 m) long and 113 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was State Route 37 over ST RTE 29 Chabot Creek built?
It was built in 2005, making it 20 years old in 2025.
What condition is State Route 37 over ST RTE 29 Chabot Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does State Route 37 over ST RTE 29 Chabot Creek carry?
About 29,000 vehicles per day (2009 count), of which roughly 25% are trucks.
How long is State Route 37 over ST RTE 29 Chabot Creek?
The structure is 969 ft (295.5 m) long with a longest span of 192 ft (58.6 m) and a deck 113 ft wide.
Who owns State Route 37 over ST RTE 29 Chabot Creek?
It is owned by the State Highway Agency.