US Bridges

Blossom Hill RD over Blossom Hill RD Ped Path

Good

Santa Clara County, California · 04-SCL-101-R28.74 · Structure no. 37 0675K

Built
2021
4 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete
Length
37 ft
1 main span
Daily traffic
2,600
2013 count
Owner
State
State Highway Agency

About this bridge

Blossom Hill RD over Blossom Hill RD Ped Path is a concrete slab carrying Blossom Hill RD over Blossom Hill RD Ped Path in Santa Clara County, California. It was built in 2021, so it is 4 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,600 vehicles a day, roughly 8% of them trucks, projected to reach 5,500 by 2043. The structure is 37 ft (11.4 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBlossom Hill RD
CrossesBlossom Hill RD Ped Path
Location04-SCL-101-R28.74
RouteState Highway 101
Coordinates37.25768, -121.79889
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length37 ft (11.4 m)
Longest span34 ft (10.5 m)
Deck width29 ft (8.7 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,600 (2013)
Projected traffic5,500 by 2043
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Blossom Hill RD over Blossom Hill RD Ped Path built?

It was built in 2021, making it 4 years old in 2025.

What condition is Blossom Hill RD over Blossom Hill RD Ped Path in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Blossom Hill RD over Blossom Hill RD Ped Path carry?

About 2,600 vehicles per day (2013 count), of which roughly 8% are trucks.

How long is Blossom Hill RD over Blossom Hill RD Ped Path?

The structure is 37 ft (11.4 m) long with a longest span of 34 ft (10.5 m) and a deck 29 ft wide.

Who owns Blossom Hill RD over Blossom Hill RD Ped Path?

It is owned by the State Highway Agency.