Blossom Hill RD over Blossom Hill RD Ped Path
FairSanta Clara County, California · 04-SCL-101-28.68 · Structure no. 37 0675J
- Built
- 2021
- 4 years old
- Condition
- Fair
- inspected April 2024
- Type
- Slab
- Concrete
- Length
- 35 ft
- 1 main span
- Daily traffic
- 21,000
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
Blossom Hill RD over Blossom Hill RD Ped Path is a concrete slab carrying Blossom Hill RD over Blossom Hill RD Ped Path in Santa Clara County, California. It was built in 2021, so it is 4 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,000 vehicles a day, roughly 8% of them trucks, projected to reach 35,000 by 2043. The structure is 35 ft (10.7 m) long and 64 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Blossom Hill RD over Blossom Hill RD Ped Path built?
It was built in 2021, making it 4 years old in 2025.
What condition is Blossom Hill RD over Blossom Hill RD Ped Path in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Blossom Hill RD over Blossom Hill RD Ped Path carry?
About 21,000 vehicles per day (2013 count), of which roughly 8% are trucks.
How long is Blossom Hill RD over Blossom Hill RD Ped Path?
The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 64 ft wide.
Who owns Blossom Hill RD over Blossom Hill RD Ped Path?
It is owned by the State Highway Agency.