US Bridges

Madonna RD over San Luis Obispo Creek

Fair

San Luis Obispo County, California · Adjacent to Caltrans Yd · Structure no. 49C0447

Built
1963
62 years old, rebuilt 2008
Condition
Fair
inspected March 2023
Type
Tee Beam
Concrete Continuous
Length
123 ft
3 main spans
Daily traffic
30,400
2006 count
Owner
City
City or Municipal Highway Agency

About this bridge

Madonna RD over San Luis Obispo Creek is a concrete continuous tee beam carrying Madonna RD over San Luis Obispo Creek in San Luis Obispo County, California. It was built in 1963 and reconstructed in 2008, so it is 62 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 30,400 vehicles a day, roughly 7% of them trucks, projected to reach 36,791 by 2045. The structure is 123 ft (37.5 m) long and 76 ft wide. If it were closed, the detour would be 4.3 mi (7 km).

CarriesMadonna RD
CrossesSan Luis Obispo Creek
LocationAdjacent to Caltrans Yd
RouteCity Street 0
Coordinates35.26667, -120.67256
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.2 US tons
Inventory rating31.7 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length123 ft (37.5 m)
Longest span55 ft (16.7 m)
Deck width76 ft (23.1 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,400 (2006)
Projected traffic36,791 by 2045
Trucks7%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed4.3 mi (7 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Madonna RD over San Luis Obispo Creek built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2008.

What condition is Madonna RD over San Luis Obispo Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Madonna RD over San Luis Obispo Creek carry?

About 30,400 vehicles per day (2006 count), of which roughly 7% are trucks.

How long is Madonna RD over San Luis Obispo Creek?

The structure is 123 ft (37.5 m) long with a longest span of 55 ft (16.7 m) and a deck 76 ft wide.

Who owns Madonna RD over San Luis Obispo Creek?

It is owned by the City or Municipal Highway Agency.