Madonna RD over US HWY 101 (@pm 27.50)
GoodSan Luis Obispo County, California · 05-SLO-101-27.50-SLO · Structure no. 49 0190
- Built
- 1963
- 62 years old, rebuilt 1987
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 266 ft
- 2 main spans
- Daily traffic
- 22,000
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
Madonna RD over US HWY 101 (@pm 27.50) is a prestressed concrete continuous stringer/multi-beam or girder carrying Madonna RD over US HWY 101 (@pm 27.50) in San Luis Obispo County, California. It was built in 1963 and reconstructed in 1987, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,000 vehicles a day, roughly 7% of them trucks, projected to reach 52,384 by 2044. The structure is 266 ft (81.1 m) long and 86 ft wide. If it were closed, the detour would be 4.3 mi (7 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Madonna RD over US HWY 101 (@pm 27.50) built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1987.
What condition is Madonna RD over US HWY 101 (@pm 27.50) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Madonna RD over US HWY 101 (@pm 27.50) carry?
About 22,000 vehicles per day (2009 count), of which roughly 7% are trucks.
How long is Madonna RD over US HWY 101 (@pm 27.50)?
The structure is 266 ft (81.1 m) long with a longest span of 88 ft (26.8 m) and a deck 86 ft wide.
Who owns Madonna RD over US HWY 101 (@pm 27.50)?
It is owned by the State Highway Agency.