Orcutt Road over West Corral De Piedra CR
FairSan Luis Obispo County, California · 0.25 MI SE Biddle Road · Structure no. 49C0113
- Built
- 1949
- 76 years old
- Condition
- Fair
- inspected July 2023
- Type
- Slab
- Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 2,438
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Orcutt Road over West Corral De Piedra CR is a concrete slab carrying Orcutt Road over West Corral De Piedra CR in San Luis Obispo County, California. It was built in 1949, so it is 76 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,438 vehicles a day, roughly 3% of them trucks, projected to reach 2,885 by 2041. The structure is 34 ft (10.4 m) long and 26 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Orcutt Road over West Corral De Piedra CR built?
It was built in 1949, making it 76 years old in 2025.
What condition is Orcutt Road over West Corral De Piedra CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Orcutt Road over West Corral De Piedra CR carry?
About 2,438 vehicles per day (2010 count), of which roughly 3% are trucks.
How long is Orcutt Road over West Corral De Piedra CR?
The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 26 ft wide.
Who owns Orcutt Road over West Corral De Piedra CR?
It is owned by the County Highway Agency.