Price Canyon Road over UP RR & AMTRAK
FairSan Luis Obispo County, California · 0.35 MI Sw/O SR 227 · Structure no. 49C0329
- Built
- 1963
- 62 years old, rebuilt 2012
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 134 ft
- 3 main spans
- Daily traffic
- 6,003
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Price Canyon Road over UP RR & AMTRAK is a prestressed concrete stringer/multi-beam or girder carrying Price Canyon Road over UP RR & AMTRAK in San Luis Obispo County, California. It was built in 1963 and reconstructed in 2012, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,003 vehicles a day, roughly 3% of them trucks, projected to reach 8,724 by 2045. The structure is 134 ft (40.8 m) long and 44 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Price Canyon Road over UP RR & AMTRAK built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2012.
What condition is Price Canyon Road over UP RR & AMTRAK in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Price Canyon Road over UP RR & AMTRAK carry?
About 6,003 vehicles per day (2010 count), of which roughly 3% are trucks.
How long is Price Canyon Road over UP RR & AMTRAK?
The structure is 134 ft (40.8 m) long with a longest span of 44 ft (13.4 m) and a deck 44 ft wide.
Who owns Price Canyon Road over UP RR & AMTRAK?
It is owned by the County Highway Agency.