Davis Road over Pixley Slough
FairSan Joaquin County, California · South of West 8 Mile Road · Structure no. 29C0440
- Built
- 2011
- 14 years old
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 71 ft
- 5 main spans
- Daily traffic
- 8,200
- 2007 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Davis Road over Pixley Slough is a concrete continuous slab carrying Davis Road over Pixley Slough in San Joaquin County, California. It was built in 2011, so it is 14 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,200 vehicles a day, roughly 5% of them trucks, projected to reach 12,531 by 2042. The structure is 71 ft (21.6 m) long and 77 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Davis Road over Pixley Slough built?
It was built in 2011, making it 14 years old in 2025.
What condition is Davis Road over Pixley Slough in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Davis Road over Pixley Slough carry?
About 8,200 vehicles per day (2007 count), of which roughly 5% are trucks.
How long is Davis Road over Pixley Slough?
The structure is 71 ft (21.6 m) long with a longest span of 15 ft (4.6 m) and a deck 77 ft wide.
Who owns Davis Road over Pixley Slough?
It is owned by the City or Municipal Highway Agency.