Davis Road over Bear Creek
FairSan Joaquin County, California · 1.0 MI N of Thornton RD · Structure no. 29C0384
- Built
- 1963
- 62 years old, rebuilt 1998
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 122 ft
- 4 main spans
- Daily traffic
- 10,200
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Davis Road over Bear Creek is a concrete continuous slab carrying Davis Road over Bear Creek in San Joaquin County, California. It was built in 1963 and reconstructed in 1998, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,200 vehicles a day, roughly 2% of them trucks, projected to reach 17,214 by 2042. The structure is 122 ft (37.2 m) long and 76 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Davis Road over Bear Creek built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1998.
What condition is Davis Road over Bear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Davis Road over Bear Creek carry?
About 10,200 vehicles per day (2010 count), of which roughly 2% are trucks.
How long is Davis Road over Bear Creek?
The structure is 122 ft (37.2 m) long with a longest span of 30 ft (9.1 m) and a deck 76 ft wide.
Who owns Davis Road over Bear Creek?
It is owned by the City or Municipal Highway Agency.