US Bridges

Interstate 80 WB over 2nd 3rd and 4th Street

Good

San Francisco County, California · 04-SF-080-4.92-SF · Structure no. 34 0126L

Built
2008
17 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
3,182 ft
29 main spans
Daily traffic
87,000
2015 count
Owner
State
State Highway Agency

About this bridge

Interstate 80 WB over 2nd 3rd and 4th Street is a prestressed concrete continuous box beam or girders - single or spread carrying Interstate 80 WB over 2nd 3rd and 4th Street in San Francisco County, California. It was built in 2008, so it is 17 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 87,000 vehicles a day, roughly 3% of them trucks, projected to reach 116,796 by 2040. The structure is 3,182 ft (969.9 m) long and 69 ft wide. If it were closed, the detour would be 34.8 mi (56 km).

CarriesInterstate 80 WB
Crosses2nd 3rd and 4th Street
Location04-SF-080-4.92-SF
RouteState Highway 80
Coordinates37.78025, -122.39871
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans29
Design loadHS 20 + Mod
Structure length3,182 ft (969.9 m)
Longest span163 ft (49.7 m)
Deck width69 ft (21 m)
Roadway width69 ft (21 m)
Vertical clearance over deck18 ft (5.6 m)

Traffic and service

Average daily traffic87,000 (2015)
Projected traffic116,796 by 2040
Trucks3%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed34.8 mi (56 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 80 WB over 2nd 3rd and 4th Street built?

It was built in 2008, making it 17 years old in 2025.

What condition is Interstate 80 WB over 2nd 3rd and 4th Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Interstate 80 WB over 2nd 3rd and 4th Street carry?

About 87,000 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is Interstate 80 WB over 2nd 3rd and 4th Street?

The structure is 3,182 ft (969.9 m) long with a longest span of 163 ft (49.7 m) and a deck 69 ft wide.

Who owns Interstate 80 WB over 2nd 3rd and 4th Street?

It is owned by the State Highway Agency.