Collier Way over Harbison Canyon Creek
FairSan Diego County, California · 25 Ft S/O Harbison Cyn RD · Structure no. 57C0714
- Built
- 2007
- 18 years old
- Condition
- Fair
- inspected May 2023
- Type
- Slab
- Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 117
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Collier Way over Harbison Canyon Creek is a concrete slab carrying Collier Way over Harbison Canyon Creek in San Diego County, California. It was built in 2007, so it is 18 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 117 vehicles a day, roughly 2% of them trucks, projected to reach 125 by 2040. The structure is 45 ft (13.7 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Collier Way over Harbison Canyon Creek built?
It was built in 2007, making it 18 years old in 2025.
What condition is Collier Way over Harbison Canyon Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Collier Way over Harbison Canyon Creek carry?
About 117 vehicles per day (2016 count), of which roughly 2% are trucks.
How long is Collier Way over Harbison Canyon Creek?
The structure is 45 ft (13.7 m) long with a longest span of 40 ft (12.2 m) and a deck 35 ft wide.
Who owns Collier Way over Harbison Canyon Creek?
It is owned by the County Highway Agency.