US Bridges

Soldin Lane over Los Coches Creek

Good

San Diego County, California · 100 Ft S/O Old HWY 80 · Structure no. 57C0796

Built
2009
16 years old
Condition
Good
inspected March 2022
Type
Culvert
Concrete Continuous
Length
39 ft
3 main spans
Daily traffic
335
2014 count
Owner
County
County Highway Agency

About this bridge

Soldin Lane over Los Coches Creek is a concrete continuous culvert carrying Soldin Lane over Los Coches Creek in San Diego County, California. It was built in 2009, so it is 16 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 335 vehicles a day, roughly 1% of them trucks, projected to reach 355 by 2039. The structure is 39 ft (11.8 m) long. If it were closed, the detour would be 61.5 mi (99 km).

CarriesSoldin Lane
CrossesLos Coches Creek
Location100 Ft S/O Old HWY 80
RouteCounty Highway 0
Coordinates32.84715, -116.86637
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length39 ft (11.8 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic335 (2014)
Projected traffic355 by 2039
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed61.5 mi (99 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Soldin Lane over Los Coches Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is Soldin Lane over Los Coches Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does Soldin Lane over Los Coches Creek carry?

About 335 vehicles per day (2014 count), of which roughly 1% are trucks.

How long is Soldin Lane over Los Coches Creek?

The structure is 39 ft (11.8 m) long with a longest span of 12 ft (3.7 m).

Who owns Soldin Lane over Los Coches Creek?

It is owned by the County Highway Agency.