Soldin Lane over Los Coches Creek
GoodSan Diego County, California · 100 Ft S/O Old HWY 80 · Structure no. 57C0796
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected March 2022
- Type
- Culvert
- Concrete Continuous
- Length
- 39 ft
- 3 main spans
- Daily traffic
- 335
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Soldin Lane over Los Coches Creek is a concrete continuous culvert carrying Soldin Lane over Los Coches Creek in San Diego County, California. It was built in 2009, so it is 16 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 335 vehicles a day, roughly 1% of them trucks, projected to reach 355 by 2039. The structure is 39 ft (11.8 m) long. If it were closed, the detour would be 61.5 mi (99 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Soldin Lane over Los Coches Creek built?
It was built in 2009, making it 16 years old in 2025.
What condition is Soldin Lane over Los Coches Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.
How much traffic does Soldin Lane over Los Coches Creek carry?
About 335 vehicles per day (2014 count), of which roughly 1% are trucks.
How long is Soldin Lane over Los Coches Creek?
The structure is 39 ft (11.8 m) long with a longest span of 12 ft (3.7 m).
Who owns Soldin Lane over Los Coches Creek?
It is owned by the County Highway Agency.