US Bridges

Tassel RD over Pomerado Creek

Good

San Diego County, California · 300FT E/O Pomerado RD · Structure no. 57C0614

Built
1972
53 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
26 ft
2 main spans
Daily traffic
1,200
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Tassel RD over Pomerado Creek is a concrete culvert carrying Tassel RD over Pomerado Creek in San Diego County, California. It was built in 1972, so it is 53 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,200 vehicles a day, roughly 1% of them trucks, projected to reach 1,356 by 2042. The structure is 26 ft (7.9 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTassel RD
CrossesPomerado Creek
Location300FT E/O Pomerado RD
RouteCity Street 0
Coordinates32.95959, -117.06149
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length26 ft (7.9 m)
Longest span12 ft (3.7 m)
Deck width48 ft (14.6 m)
Roadway width36 ft (10.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,200 (2020)
Projected traffic1,356 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tassel RD over Pomerado Creek built?

It was built in 1972, making it 53 years old in 2025.

What condition is Tassel RD over Pomerado Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Tassel RD over Pomerado Creek carry?

About 1,200 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Tassel RD over Pomerado Creek?

The structure is 26 ft (7.9 m) long with a longest span of 12 ft (3.7 m) and a deck 48 ft wide.

Who owns Tassel RD over Pomerado Creek?

It is owned by the City or Municipal Highway Agency.