US Bridges

El Norte Parkway over Escondido Creek

Fair

San Diego County, California · 0.22M W/O Valley Pkwy · Structure no. 57C0356

Built
1973
52 years old, rebuilt 2021
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
52 ft
1 main span
Daily traffic
21,927
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

El Norte Parkway over Escondido Creek is a prestressed concrete stringer/multi-beam or girder carrying El Norte Parkway over Escondido Creek in San Diego County, California. It was built in 1973 and reconstructed in 2021, so it is 52 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 21,927 vehicles a day, roughly 1% of them trucks, projected to reach 14,848 by 2042. The structure is 52 ft (15.7 m) long and 96 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesEl Norte Parkway
CrossesEscondido Creek
Location0.22M W/O Valley Pkwy
RouteCity Street 0
Coordinates33.14986, -117.03717
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating31.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length52 ft (15.7 m)
Longest span52 ft (15.7 m)
Deck width96 ft (29.3 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,927 (2020)
Projected traffic14,848 by 2042
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was El Norte Parkway over Escondido Creek built?

It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2021.

What condition is El Norte Parkway over Escondido Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does El Norte Parkway over Escondido Creek carry?

About 21,927 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is El Norte Parkway over Escondido Creek?

The structure is 52 ft (15.7 m) long with a longest span of 52 ft (15.7 m) and a deck 96 ft wide.

Who owns El Norte Parkway over Escondido Creek?

It is owned by the City or Municipal Highway Agency.