Rose Ave over Escondido Creek
FairSan Diego County, California · 0.1 MI N/O Valley Pkwy · Structure no. 57C0454
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 71 ft
- 1 main span
- Daily traffic
- 13,300
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Rose Ave over Escondido Creek is a prestressed concrete box beam or girders - multiple carrying Rose Ave over Escondido Creek in San Diego County, California. It was built in 1970, so it is 55 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,300 vehicles a day, roughly 1% of them trucks, projected to reach 20,974 by 2041. The structure is 71 ft (21.6 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rose Ave over Escondido Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is Rose Ave over Escondido Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Rose Ave over Escondido Creek carry?
About 13,300 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Rose Ave over Escondido Creek?
The structure is 71 ft (21.6 m) long with a longest span of 67 ft (20.4 m) and a deck 52 ft wide.
Who owns Rose Ave over Escondido Creek?
It is owned by the City or Municipal Highway Agency.