US Bridges

W11-W905 Connector over WB 905 Offramp

Good

San Diego County, California · 11-SD-011-0.20-OTM · Structure no. 57 1228F

Built
2015
10 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
188 ft
1 main span
Daily traffic
3,500
2018 count
Owner
State
State Highway Agency

About this bridge

W11-W905 Connector over WB 905 Offramp is a prestressed concrete box beam or girders - multiple carrying W11-W905 Connector over WB 905 Offramp in San Diego County, California. It was built in 2015, so it is 10 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,500 vehicles a day, roughly 5% of them trucks, projected to reach 6,631 by 2042. The structure is 188 ft (57.3 m) long and 42 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesW11-W905 Connector
CrossesWB 905 Offramp
Location11-SD-011-0.20-OTM
RouteState Highway 11
Coordinates32.56432, -116.9503
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating31.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length188 ft (57.3 m)
Longest span185 ft (56.4 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,500 (2018)
Projected traffic6,631 by 2042
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was W11-W905 Connector over WB 905 Offramp built?

It was built in 2015, making it 10 years old in 2025.

What condition is W11-W905 Connector over WB 905 Offramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does W11-W905 Connector over WB 905 Offramp carry?

About 3,500 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is W11-W905 Connector over WB 905 Offramp?

The structure is 188 ft (57.3 m) long with a longest span of 185 ft (56.4 m) and a deck 42 ft wide.

Who owns W11-W905 Connector over WB 905 Offramp?

It is owned by the State Highway Agency.