US Bridges

S125-905 Connector over W11 E11 SR 905

Good

San Diego County, California · 11-SD-125-0.69-OTM · Structure no. 57 1154F

Built
2022
3 years old
Condition
Good
inspected May 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
999 ft
5 main spans
Daily traffic
8,900
2018 count
Owner
State
State Highway Agency

About this bridge

S125-905 Connector over W11 E11 SR 905 is a prestressed concrete continuous box beam or girders - multiple carrying S125-905 Connector over W11 E11 SR 905 in San Diego County, California. It was built in 2022, so it is 3 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,900 vehicles a day, roughly 1% of them trucks, projected to reach 9,724 by 2044. The structure is 999 ft (304.5 m) long and 42 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesS125-905 Connector
CrossesW11 E11 SR 905
Location11-SD-125-0.69-OTM
RouteState Highway 125
Coordinates32.56464, -116.94872
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHL 93
Structure length999 ft (304.5 m)
Longest span222 ft (67.7 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,900 (2018)
Projected traffic9,724 by 2044
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S125-905 Connector over W11 E11 SR 905 built?

It was built in 2022, making it 3 years old in 2025.

What condition is S125-905 Connector over W11 E11 SR 905 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does S125-905 Connector over W11 E11 SR 905 carry?

About 8,900 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is S125-905 Connector over W11 E11 SR 905?

The structure is 999 ft (304.5 m) long with a longest span of 222 ft (67.7 m) and a deck 42 ft wide.

Who owns S125-905 Connector over W11 E11 SR 905?

It is owned by the State Highway Agency and maintained by the Local Toll Authority.