N15-E8 Connector over Camino Del Rio So Ramps
GoodSan Diego County, California · 11-SD-015-R6.00-SD · Structure no. 57 0886G
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 627 ft
- 5 main spans
- Daily traffic
- 13,400
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
N15-E8 Connector over Camino Del Rio So Ramps is a prestressed concrete continuous box beam or girders - single or spread carrying N15-E8 Connector over Camino Del Rio So Ramps in San Diego County, California. It was built in 1986, so it is 39 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,400 vehicles a day, roughly 1% of them trucks, projected to reach 15,612 by 2041. The structure is 627 ft (191.1 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N15-E8 Connector over Camino Del Rio So Ramps built?
It was built in 1986, making it 39 years old in 2025.
What condition is N15-E8 Connector over Camino Del Rio So Ramps in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does N15-E8 Connector over Camino Del Rio So Ramps carry?
About 13,400 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is N15-E8 Connector over Camino Del Rio So Ramps?
The structure is 627 ft (191.1 m) long with a longest span of 152 ft (46.3 m) and a deck 30 ft wide.
Who owns N15-E8 Connector over Camino Del Rio So Ramps?
It is owned by the State Highway Agency.