US Bridges

E8-S15 Connector over Camino Del Rio South

Good

San Diego County, California · 11-SD-008-5.62-SD · Structure no. 57 0883G

Built
1986
39 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
237 ft
3 main spans
Daily traffic
9,100
2014 count
Owner
State
State Highway Agency

About this bridge

E8-S15 Connector over Camino Del Rio South is a prestressed concrete continuous box beam or girders - multiple carrying E8-S15 Connector over Camino Del Rio South in San Diego County, California. It was built in 1986, so it is 39 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,100 vehicles a day, roughly 4% of them trucks, projected to reach 11,000 by 2042. The structure is 237 ft (72.2 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE8-S15 Connector
CrossesCamino Del Rio South
Location11-SD-008-5.62-SD
RouteInterstate 8
Coordinates32.77764, -117.11267
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length237 ft (72.2 m)
Longest span119 ft (36.3 m)
Deck width31 ft (9.3 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,100 (2014)
Projected traffic11,000 by 2042
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was E8-S15 Connector over Camino Del Rio South built?

It was built in 1986, making it 39 years old in 2025.

What condition is E8-S15 Connector over Camino Del Rio South in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does E8-S15 Connector over Camino Del Rio South carry?

About 9,100 vehicles per day (2014 count), of which roughly 4% are trucks.

How long is E8-S15 Connector over Camino Del Rio South?

The structure is 237 ft (72.2 m) long with a longest span of 119 ft (36.3 m) and a deck 31 ft wide.

Who owns E8-S15 Connector over Camino Del Rio South?

It is owned by the State Highway Agency.