Foothill Blvd over Middle Channel Day Wash
GoodSan Bernardino County, California · 0.1 MI W Route 15 · Structure no. 54C0697M
- Built
- 1914
- 111 years old, rebuilt 1937
- Condition
- Good
- inspected June 2024
- Type
- Slab
- Concrete
- Length
- 24 ft
- 2 main spans
- Daily traffic
- 47,000
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Foothill Blvd over Middle Channel Day Wash is a concrete slab carrying Foothill Blvd over Middle Channel Day Wash in San Bernardino County, California. It was built in 1914 and reconstructed in 1937, so it is 111 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 47,000 vehicles a day, roughly 2% of them trucks, projected to reach 63,917 by 2044. The structure is 24 ft (7.3 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Foothill Blvd over Middle Channel Day Wash built?
It was built in 1914, making it 111 years old in 2025. It was reconstructed in 1937.
What condition is Foothill Blvd over Middle Channel Day Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Foothill Blvd over Middle Channel Day Wash carry?
About 47,000 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Foothill Blvd over Middle Channel Day Wash?
The structure is 24 ft (7.3 m) long with a longest span of 11 ft (3.4 m) and a deck 85 ft wide.
Who owns Foothill Blvd over Middle Channel Day Wash?
It is owned by the City or Municipal Highway Agency.