US Bridges

Interstate 15 NB over Foothill Blvd

Good

San Bernardino County, California · 08-SBD-015-5.28-RCUC · Structure no. 54 0922R

Built
1975
50 years old, rebuilt 1997
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
223 ft
2 main spans
Daily traffic
101,500
2019 count
Owner
State
State Highway Agency

About this bridge

Interstate 15 NB over Foothill Blvd is a prestressed concrete continuous stringer/multi-beam or girder carrying Interstate 15 NB over Foothill Blvd in San Bernardino County, California. It was built in 1975 and reconstructed in 1997, so it is 50 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 101,500 vehicles a day, roughly 8% of them trucks, projected to reach 120,000 by 2040. The structure is 223 ft (68 m) long and 87 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesInterstate 15 NB
CrossesFoothill Blvd
Location08-SBD-015-5.28-RCUC
RouteInterstate 15
Coordinates34.1061, -117.5319
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length223 ft (68 m)
Longest span115 ft (35 m)
Deck width87 ft (26.6 m)
Roadway width85 ft (25.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic101,500 (2019)
Projected traffic120,000 by 2040
Trucks8%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 15 NB over Foothill Blvd built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 1997.

What condition is Interstate 15 NB over Foothill Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Interstate 15 NB over Foothill Blvd carry?

About 101,500 vehicles per day (2019 count), of which roughly 8% are trucks.

How long is Interstate 15 NB over Foothill Blvd?

The structure is 223 ft (68 m) long with a longest span of 115 ft (35 m) and a deck 87 ft wide.

Who owns Interstate 15 NB over Foothill Blvd?

It is owned by the State Highway Agency.